Checked against the Marketing Discipline Guidelines 2024 (Ver. 1, effective 24.10.2024) on 24 November 2026. Published by MDG Services on 24 November 2026.
The card
The full 14 steps, in order, are on receiving a tanker.
| Stage | Check | Clause |
|---|---|---|
| Before | Match the invoice to the lorry: lorry number, seal or lock, compartments with product and quantity, departure time, 15°C density, dip rod and certificate | MDG 1.1 |
| Before | Level ground, 10 minutes to settle, earthing and bonding, DCP extinguisher near the lorry, no plastic or PVC hose | MDG 1.2(i) |
| Before | Seal or lock on the manifold and manhole covers against the invoice; release the master valve levers; then the certificate, the dip rod, and every compartment's dip and water paste. See seal or lock mismatch and dip rod and certificate | MDG 1.2(ii) MDG 1.2(iii) MDG 1.2(v) MDG 1.2(vi) MDG 1.2(vii) |
| Before | Stop sales from the underground tank that will receive the product | MDG 1.2(vii) |
| Before | Each compartment's 15°C density within ±3.0 kg/m³ of the invoice, written in the register; then bottom retention samples, label signed by you and the driver | MDG 1.2(iv) MDG 1.2(viii) MDG 1.2(x) MDG 2.3 |
| Before | Short dip or water: make it up, record it on the invoice copies, both sign (see short dip and water) | MDG 1.2(xi) |
| During | Sales from that tank stay stopped until decantation is complete; each product goes into its correct underground tank; the extinguisher stays near | MDG 1.2(vii) MDG 1.2(xi) MDG 1.2(i) |
| After | Lorry fully empty before it is released; stock register or stock display board entry | MDG 1.2(xii) MDG 1.2(xiii) |
| After | At least 50 litres through the pump, then a nozzle sample; its 15°C density goes in the density register | MDG 1.2(xiv) MDG Annexure 1 |
If something stops the job
- Driver will not sign the sample label. Do not decant. Contact the supply location or the sales officer MDG 2.3 Note (i).
- Unusual deviation in time or route. Inform the supply location (before accepting the lorry) or the sales officer, and decant only on further instructions MDG 1.5(vii) MDG 2.3 Note (ii). See VTS and route deviation.
- Doubt about quality. Contact the supply location or the Area Field Officer MDG 1.2(ix).
What MDG leaves out
MDG says nothing about where staff stand or about mobile phones during unloading. It does require the dealer to observe PESO rules MDG 1.5(ii); ask your oil company what applies at your outlet. Whether other tanks may keep selling is on selling during unloading.
Questions dealers ask
01What should I watch while the tanker is actually unloading?
What MDG says that applies while product flows: sales from the receiving tank stay stopped until decantation is complete MDG 1.2(vii), each product goes into its correct underground tank MDG 1.2(xi), the DCP extinguisher stays near the lorry, and no plastic or PVC hose is used MDG 1.2(i).
02Can a plastic hose be used to unload a tanker?
No. The discharge hoses must meet all safety requirements, and MDG says plastic or PVC hose pipes are not to be used under any circumstances MDG 1.2(i).
03When is the density recorded after unloading?
After at least 50 litres have gone through the pump. Take a nozzle sample and write its 15°C density in the density register MDG 1.2(xiv).
04What if the driver will not sign the sample label?
Do not decant. Contact the supply location or the sales officer MDG 2.3 Note (i).
Read the official text: Marketing Discipline Guidelines 2024 (PDF on Bharat Petroleum's website) (also published on iocl.com).
Related pages
About Dealer Kavach (advertisement)
Dealer Kavach is an app from MDG Services that tracks your outlet's filings, renewals, inspections and daily reports, and reminds you before deadlines, in Hindi and English.