Checked against the Marketing Discipline Guidelines 2024 (Ver. 1, effective 24.10.2024) on 24 November 2026. Published by MDG Services on 24 November 2026.
What to match, detail by detail
On arrival, each invoice detail is checked against the real lorry MDG 1.1. The rest of the receipt order is on receiving a tanker.
| On the invoice | Compare with | Clause |
|---|---|---|
| Tank lorry number | The number on the lorry | MDG 1.1 |
| Seal or lock number | The seal or lock on the delivery manifold and manhole covers (see seal or lock mismatch) | MDG 1.1(ii) MDG 1.2(ii) |
| Compartments, product and quantity in each | The compartments and the dip of each | MDG 1.1(iii) MDG 1.2(vii) |
| Time the lorry left the supply point | When it arrived, and what the tracking link showed (see VTS and route deviation) | MDG 1.1(iv) MDG 1.5(vii) |
| Density at 15°C | Each compartment's 15°C density, within ±3.0 kg/m³ (see invoice density check) | MDG 1.1(v) MDG 1.2(iv) |
| Dip rod with calibration certificate | The rod and certificate the driver shows (see dip rod and certificate) | MDG 1.1(vi) MDG 1.2(v) |
The supply location fills in the invoice: it writes the density, the filling point, the tank number and the release time MDG 2.2.1(iv), and records the seal or lock numbers MDG 3.2. MDG does not say what the dealer does if one of these is missing.
Who to call
| What you find | Who to contact | Clause |
|---|---|---|
| Doubt about quality | The supply location or the Area Field Officer, for further instructions | MDG 1.2(ix) |
| Deviation in time or route | The supply location, before accepting the lorry; decant only on further instructions | MDG 1.5(vii) MDG 2.3 Note (ii) |
| Driver will not sign the sample label | Do not decant; contact the supply location or the sales officer | MDG 2.3 Note (i) |
What MDG does not say
MDG gives no step for a wrong lorry number or a missing invoice detail, and does not say whether to reject the load. A dip that is short against the certificate is made up as set out on short dip and water MDG 1.2(xi). Ask your oil company how it wants a hold or a refusal handled.
General practice, not an MDG rule: write the mismatch, the name of the person you informed and the time on your copy of the invoice.
Questions dealers ask
01What should I do when the tanker does not match the invoice?
Compare each invoice detail with the lorry MDG 1.1. MDG gives no step for a mismatch itself, apart from making up a short dip MDG 1.2(xi). If quality is in doubt, contact the supply location or the Area Field Officer MDG 1.2(ix); if the lorry deviated in time or route, tell the supply location before accepting it MDG 1.5(vii).
02What must the supply location write on the invoice?
The density at 15°C, the filling point, the storage tank number and the time the lorry was released MDG 2.2.1(iv). It also records the seal or lock numbers MDG 3.2.
03Can I refuse a tanker that does not match its invoice?
MDG does not say. It only sends the dealer to the supply location or an oil company officer for instructions MDG 1.2(ix) MDG 1.5(vii); ask your oil company what it wants done.
04What if the lorry reached the pump late or by another route?
Tell the supply location before accepting the lorry and act on the oil company officials' instructions MDG 1.5(vii). After an unusual deviation in time or route, decant only on further instructions MDG 2.3 Note (ii).
Read the official text: Marketing Discipline Guidelines 2024 (PDF on Bharat Petroleum's website) (also published on iocl.com).
Related pages
About Dealer Kavach (advertisement)
Dealer Kavach is an app from MDG Services that tracks your outlet's filings, renewals, inspections and daily reports, and reminds you before deadlines, in Hindi and English.