Checked against the Marketing Discipline Guidelines 2024 (Ver. 1, effective 24.10.2024) on 24 November 2026. Published by MDG Services on 24 November 2026.
Four checks on the paper
| Check | What MDG 2024 says | Clause |
|---|---|---|
| Date of the notice | Within 30 days of the inspection. If petrol or diesel samples were drawn, within 30 days of the test results. | MDG 8.5.6 |
| Findings and papers | All the irregularities are listed. Every report and document it rests on should come with it. | MDG 8.5.6 |
| Date of issue | The 10 days to reply count from the date of issue, not from receipt | MDG 8.5.7 |
| Instance | The five years before the date an irregularity is established decide whether it is the first, second or third, and the previous guideline counts. See how repeats are counted. | MDG 8.5.5 |
MDG asks you to hold the inspection and test reports on file at the outlet MDG 1.5(iv). General practice, not an MDG rule: keep them beside the notice to compare dates, and write on the notice the day it reached you.
What comes after your reply
The timeline page has the sequence. MDG sets four later points:
- A speaking order, preferably within 45 days of the company receiving your reply. It sets out the irregularities, your reply and why the reply is or is not accepted MDG 8.5.8.
- A personal hearing before termination is recommended or approved, for a critical irregularity. A missed date is followed by one more MDG 8.6.
- A re-test request, if a sample failed: within 10 days of receiving the lab report, not from the notice MDG 2.5(H). See failed samples.
- An appeal, for termination only, within 30 days of receiving the order MDG 8.9. See the appeal.
What MDG 2024 does not say
- It gives no format for a notice or a reply, and does not say who signs the notice.
- It does not say how days are counted, or whether the 10 days can be extended.
- It does not say what follows if a notice is late.
An example
For example, an inspection on 12 October 2026 draws petrol samples, and the lab result is dated 27 October. The 30 days run from the result, to 26 November, so a notice issued on 20 November is inside them MDG 8.5.6. If the day of issue is counted as day 0, the reply is due by 30 November MDG 8.5.7.
General information, not legal advice. For your own notice, speak to an advocate or your oil company.
Questions dealers ask
01What should I check first when I get a show cause notice?
Its date against the inspection date, or the test result date if samples were drawn. Then that it lists all the irregularities and comes with the reports it rests on MDG 8.5.6. Note the date of issue too, because the reply period starts there MDG 8.5.7.
02Which date starts the 10 days to reply?
The date the notice was issued, not the day it reached you MDG 8.5.7. MDG does not say how days are counted, so check the last day against your notice.
03What if the notice came more than 30 days after the inspection?
First check whether samples were drawn: then the 30 days run from the test results MDG 8.5.6. MDG does not say what follows if a notice is late. Ask an advocate or your oil company.
Read the official text: Marketing Discipline Guidelines 2024 (PDF on Bharat Petroleum's website) (also published on iocl.com).